What does this calculator estimate?
It estimates peak discharge using the NRCS TR-55 Graphical Peak Discharge method (June 1986). It calculates peak discharge only, not hydrographs, routing, or TR-20.
Watershed hydrology / Graphical peak discharge
From rainfall and watershed characteristics to peak flow—with the calculation path visible.
The NRCS TR-55 Graphical Peak Discharge method combines unit peak discharge, drainage area, runoff depth, and a pond and swamp adjustment: qp = qu × Am × Q × Fp. Enter one homogeneous watershed’s characteristics to estimate its peak discharge.
Select one of the four NRCS 24-hour rainfall distribution types: I, IA, II, or III. Time of concentration Tc and the ratio of initial abstraction to rainfall, Ia/P, select unit peak discharge qu. Calculations use US units internally; the unit switch converts the displayed inputs and results.
All fields are required.
Results shown to 4 significant figures.
— m³/s
Potential retention, S
Initial abstraction, Ia
Ia/P, computed
Runoff depth, Q
Unit peak discharge, qu
Pond & swamp factor, Fp
Enter valid inputs to inspect the Table F-1 lookup.
| Ia/P row | C₀ | C₁ | C₂ | qu (csm/in) |
|---|---|---|---|---|
| No calculation yet. | ||||
—
Tc used: —
Internal US-unit inputs: —
—
P, S, Ia, and Q are in inches; Am is in mi²; Tc is in hours. Table F-1 gives the coefficients. Between rows, calculate qu at each row, then interpolate qu linearly in r.
Table 4-2 uses the nearest pond percentage: 0 → 1.00; 0.2 → 0.97; 1 → 0.87; 3 → 0.75; 5 → 0.72. A tie selects the lower percentage.
It estimates peak discharge using the NRCS TR-55 Graphical Peak Discharge method (June 1986). It calculates peak discharge only, not hydrographs, routing, or TR-20.
Rainfall type, time of concentration, and Ia/P select unit peak discharge from Table F-1. Between rows, the calculator interpolates unit peak discharge linearly, not the coefficients. Ia/P is limited to 0.10–0.50 and time of concentration to 0.1–10 hours, with warnings when a limit is used.
The adjustment factor Fp uses the nearest Table 4-2 percentage: 0, 0.2, 1, 3, or 5 percent. A tie uses the lower percentage. Above 5 percent, Fp is 0.72 with a warning. These pond and swamp areas must be spread through the watershed and not in the time-of-concentration flow path.
When rainfall P is less than or equal to initial abstraction Ia, runoff depth Q and peak discharge qp are zero. Initial abstraction is calculated as Ia = 0.2S, where S = 1000/CN − 10 in inches.